Zoning acquisition standard
docs(entity-naming): fix zoning-acquisition-rules.md's MCorp verb-based/sentence-initial defect flagged by Phase 3 as a Phase 1/2 leftover (entity-naming-convention.md §7.7)
@@ -11,7 +11,7 @@ status: active audience: customer-woodfine bcsc_class: current-fact language_protocol: PROSE-TOPIC last_edited: 2026-07-11 last_edited: 2026-08-26 editor: pointsav-engineering short_description: "Pre-purchase verification requirements ensuring every parcel acquired has confirmed zoning for the intended development, eliminating speculative land banking." paired_with: site-selection/zoning-acquisition-rules.es.md @@ -20,7 +20,7 @@ cites: - osc-sn-51-721 --- MCorp verifies zoning approval and establishes an active development timeline before completing any land acquisition — speculative land banking is prohibited by the acquisition model, not just by policy. Every parcel has a verified path to development under applicable municipal regulations before the purchase contract is executed. The rule is applied alongside the [[co-location-anchors|anchor]] adjacency requirement and the [[asset-architecture-standard|Asset Architecture Standard]]; the development timeline is recorded by [[site-ledger-integration|site ledger integration]]. No parcel is acquired without verified zoning approval and an active development timeline — speculative land banking is prohibited by the acquisition model, not just by policy. Woodfine confirms both, and every parcel has a verified path to development under applicable municipal regulations, before the purchase contract is executed. The rule is applied alongside the [[co-location-anchors|anchor]] adjacency requirement and the [[asset-architecture-standard|Asset Architecture Standard]]; the development timeline is recorded by [[site-ledger-integration|site ledger integration]]. ## Pre-acquisition zoning verification