Zoning acquisition standard
docs(site-selection): retitle 'Zoning acquisition rules' to 'Zoning acquisition standard' -- 'rules' implied mechanical certainty the corrected content no longer claims (judgment-based due diligence, disclosed entitlement risk); slug unchanged, 5 inbound link labels fixed (operator-caught)
@@ -1,6 +1,6 @@ --- schema: foundry-doc-v1 title: "Zoning acquisition rules" title: "Zoning acquisition standard" slug: zoning-acquisition-rules category: site-selection index_group: before-land-is-bought @@ -11,7 +11,7 @@ status: active audience: customer-woodfine bcsc_class: current-fact language_protocol: PROSE-TOPIC last_edited: 2026-08-26 last_edited: 2026-08-27 editor: pointsav-engineering short_description: "Pre-purchase entitlement verification: every parcel is acquired against either a permitted use or an evidenced, achievable rezoning path, with an active development timeline and no speculative land banking." paired_with: site-selection/zoning-acquisition-rules.es.md @@ -20,7 +20,7 @@ cites: - osc-sn-51-721 --- Every parcel is acquired against a verified entitlement position and an active development timeline. Where the intended development is already a permitted use, that position is the existing zoning. Where it is not, acquisition proceeds only if diligence has established a credible, achievable path to rezoning. Speculative land banking is prohibited by the acquisition model, not just by policy. The rule is applied alongside the [[co-location-anchors|anchor]] adjacency requirement and the [[asset-architecture-standard|Asset Architecture Standard]]; the development timeline is recorded by [[site-ledger-integration|site ledger integration]]. Every parcel is acquired against a verified entitlement position and an active development timeline. Where the intended development is already a permitted use, that position is the existing zoning. Where it is not, acquisition proceeds only if diligence has established a credible, achievable path to rezoning. Speculative land banking is prohibited by the acquisition model, not just by policy. The standard is applied alongside the [[co-location-anchors|anchor]] adjacency requirement and the [[asset-architecture-standard|Asset Architecture Standard]]; the development timeline is recorded by [[site-ledger-integration|site ledger integration]]. ## Pre-acquisition entitlement verification