Zone depths per use type — sources, values, rationale

Companion: bim-building-width-method for the formula and the mirror cross-section.

This article catalogues the per-side zone depths feeding the Tile system and the floor plate methodology; the inventory of named Key Plans is in the Key Plans index. Sub-type specialisations are documented under Professional Office and its Medical, Business, and Private Office sub-articles.

Summary table — canonical values

The Z1/Z2/Z3 values below are the per-side depths (Z1 and Z2 are mirrored, Z3 is centreline single). All values trace to the cited source.

Use Type Z1 Habitat Z2 Magazine Z3 Corridor Building Width Source
Private Office 5.9944 m / 19'8" 1.3716 m / 4'6" 14.73 m / 48'4" PO-1/PO-2/PO-3 sketches
Academic 4.7 m / 15'5" 3.0 m / 9'10" 15.40 m / 50'6" Summary V2, 2025-05-13
Professional Office (V12 baseline) 6.0 m / 19'8" 3.0 m / 9'10" 3.0 m / 9'10" 21.00 m / 68'11" V12, 2025-01-07 (Z2/Z3 marked TBD)
Laboratory 6.7818 m / 22'3" 4.8006 m / 15'9" 3.048 m / 10'0" 26.21 m / 86'0" Summary V2; IBC high-hazard egress
Medical 7.2819 m / 23'10" 4.877 m / 16'0" 2.892 m / 9'5" 27.20 m / 89'3" M3/M1/M2 sketches (286 5/8" + 192" + 113 7/8")
Business 5.51 m / 18'1" 9.26 m / 30'5" 2.75 m / 9'0" 29.30 m / 96'2" Notes V3 Option A/A (widest enumerated)
Civic 6.0 m / 19'8" 7.23 m / 23'9" 3.6 m / 11'10" 30.06 m / 98'8" Synthesised values; no completed sketch

Formula: Width = 2 × (Z1 + Z2) + Z3. See bim-building-width-method for the derivation.

Per use type

Private Office (PO-1 / PO-2 / PO-3)

Zone Value Sketch evidence
Z1 Habitat 5.9944 m / 19'8" "19'-8"" on each of PO-1, PO-2, PO-3
Z2 Magazine 1.3716 m / 4'6" "4'-6"" on each sketch (shallow storage zone, below the dashed centreline)
Z3 Corridor — (none) Each office opens to the shared building corridor (outside the leasehold)
Key plan SF PO-1 = 325, PO-2 = 465, PO-3 = 685 Sketch labels
Key plan m² 30.19, 43.20, 63.64 Calculated from SF
Building width 14.73 m / 48'4" 2 × (5.9944 + 1.3716)

Private Office is the narrowest of the use types. The 5.9944 m Habitat is marginally under the 6.0 m European Lighting Standard threshold — flagged for review at Key Plan sign-off.

Combinations: PO-1 + PO-1 = 60.4 m² (650 SF); PO-1 + PO-2 = 73.4 m² (790 SF); PO-1 + PO-3 = 93.8 m² (1,010 SF); PO-2 + PO-3 = 106.8 m² (1,150 SF). These fill the gap between Private Office Large and Professional Office Small.

Academic (A1 / A2 / A3)

Zone Value Source
Z1 Habitat 4.7 m / 15'5" Summary V2
Z2 Magazine 3.0 m / 9'10" Summary V2 (the source shows "3'7"" in feet, which is a transposition; 3.0 m = 9'10" is correct)
Z3 Corridor — (none) Suites open to building corridor
Key plan m² Small 87.7 / Medium 240.3 / Large 376.3 Key Plans Samples V2
Key plan SF Small 944 / Medium 2,586 / Large 4,050
Building width 15.40 m / 50'6" 2 × (4.7 + 3.0)

Academic compresses Habitat below 6 m because seating faces forward (toward a podium/board) rather than toward the façade. The European Lighting Standard applies to workstations; auditorium-style seating is not workstation use.

Inconsistency: building-width-calculator.dtcg.json records Academic Small as 105 m² / 1,131 SF, while professional-office-subtypes.dtcg.json records it as 87.7 m² / 944 SF. Pending operator decision on which is canonical.

Professional Office (baseline)

Zone Value Source
Z1 Habitat 6.0 m / 19'8" V12 (January 2025)
Z2 Magazine 3.0 m / 9'10" V12 — marked "TBD"; placeholder
Z3 Corridor 3.0 m / 9'10" V12 — marked "TBD"; placeholder
Key plan m² Small 130.06 (only) DTCG token; Medium/Large pending
Key plan SF Small 1,400 (only) DTCG token
Building width 21.00 m / 68'11" V12 stated total

Professional Office is the baseline use type — the type from which the other Professional Centre sub-types (Medical, Business, Laboratory, Academic, Civic) are derived by varying Z1, Z2, and Z3.

V12 explicitly marks Z2 and Z3 as "TBD" with 3 m placeholders. When the Professional Office Key Plan is completed, the operator will lock Z2 and Z3 to match the furnished layout.

Laboratory (L1 / L2 / L3)

Zone Value Source
Z1 Habitat 6.7818 m / 22'3" Summary V2
Z2 Magazine 4.8006 m / 15'9" Summary V2
Z3 Corridor 3.048 m / 10'0" Summary V2 (IBC high-hazard occupancy minimum)
Key plan m² Small 195.0 / Medium 316.0 / Large 400.7 Samples V2
Key plan SF Small 2,099 / Medium 3,401 / Large 4,313 Samples V2
Building width 26.21 m / 86'0" 2 × (6.7818 + 4.8006) + 3.048

Laboratory's wider Z1 accommodates bench depth (Treston TP-915 ≈ 900 mm) and fume-hood clearance (≈ 940 mm + 1,500 mm egress in front of the hood). The 10'0" corridor is the IBC high-hazard occupancy egress minimum.

Specialisations: Medical Laboratory, Research Laboratory.

Medical (M1 / M2 / M3)

Zone Value Sketch evidence
Z1 Habitat 7.2819 m / 23'10" "286 5/8"" on M1/M2/M3 (= 7.282 m)
Z2 Magazine 4.877 m / 16'0" "192"" on M1/M2/M3 (= 4.877 m)
Z3 Corridor 2.892 m / 9'5" "113 7/8"" on M1/M2/M3 (= 2.892 m)
M3 (Small, 2 dental chairs) 2,401.5 SF / 223 m² Sketch label
M1 (Medium, 4 dental chairs) 3,567.7 SF / 331 m² Sketch label
M2 (Large, 6 dental chairs) 5,231.4 SF / 486 m² Sketch label
Building width 27.20 m / 89'3" 2 × (7.2819 + 4.877) + 2.892

Medical has the widest Habitat across the use types. The depth accommodates exam-table depth (Midmark 626 ≈ 790 mm) plus patient seating, clinician circulation, and a reception window facing the façade. The 2.892 m corridor is the ADA/CSA-B651 stretcher-and-wheelchair clearance.

Operator notes on the M3 sketch flag: "Add second door for emergencies", "Line of sight — safety — reception needs to see the door", and "Move seats down out of Zone #1".

Specialisations: Dentist, General Practitioner.

Business (B1 / B2 / B3)

The Business use type has 21 enumerated width options per Notes V3. The token store records the widest symmetric option as the default:

Zone Value Source
Z1 Habitat 5.51 m / 18'1" Notes V3 Option A
Z2 Magazine 9.26 m / 30'5" Notes V3 Option A (widest enumerated)
Z3 Corridor 2.75 m / 9'0" Notes V3 (fixed across all 21 options)
Key plan SF Small 3,350 / Medium 4,302 / Large 7,524 Sketches 2-4
Building width 32.29 m / 105'11" 2 × (5.51 + 9.26) + 2.75 (Option A/A)

Important caveat: Notes V3 enumerates 21 combinations (Option A/A through D/D), where the two letters denote the left-side and right-side Z1/Z2 choices. The narrowest Business option is 25.29 m (D/D) and the widest is 32.29 m (A/A). The asymmetric options are generally disfavoured for tile composition because demising walls must absorb the asymmetry.

From operator commentary in Notes V3 on Option D: "The overall area of the Fixed Floor Plates [is] Professional Centres at approximately 19,000 SF to 23,000 SF and Suburban Office at approximately 17,000 SF to 21,000 SF."

Civic (C1 / C2 / C3)

Zone Value Source
Z1 Habitat 6.0 m / 19'8" Synthesised (no completed sketch)
Z2 Magazine 7.23 m / 23'9" Synthesised (token store value)
Z3 Corridor 3.6 m / 11'10" Synthesised — public assembly egress
Key plan m² Small 270 / Medium 577 / Large 822 Token store (samples-derived)
Key plan SF Small 2,912 / Medium 6,215 / Large 8,850 Token store
Building width 30.06 m / 98'8" 2 × (6.0 + 7.23) + 3.6

Civic does not yet have a completed sketch. Z1/Z2/Z3 values in the token store are synthesised from the design intent (public records storage; widest corridor for ceremonial circulation and public assembly egress). Specialisations: Courtroom, Municipal Office, Cultural Space, Civic Assembly.

The 0.7 m perpendicular-desk addition

Applies to any Z1 Habitat that arranges desks perpendicular to the façade. Token: bim.circulation-addition.perpendicular-desk = 0.7 m. Effective Z1 = 6.0 + 0.7 = 6.7 m when perpendicular desks are required to seat three desks in series.

Floor-plate target ranges

Class Range
Professional Centres 19,000 – 23,000 SF
Suburban Office 17,000 – 21,000 SF

The current token store hard-codes 20,000 SF as floorPlate.netLeasableSF. Convert to a range with PC and SU variants.

Future research

  • Confirm Academic Small key plan area: 87.7 m² (944 SF) per Samples V2 vs. 105 m² (1,131 SF) per DTCG token store
  • Complete Civic sketch to anchor Z1/Z2/Z3 values to a real furniture arrangement
  • Confirm operator preference for Business: Option A/A (widest, 32.29 m) versus a balanced option such as C/C (~27 m)
  • Capture manufacturer SKU dimensions in a furniture.dtcg.json file
  • Complete Professional Office Z2/Z3 (currently V12 placeholders at 3 m / 3 m TBD)
  • Document the 0.7 m perpendicular-desk supplement as an effective-Habitat modifier
  • Verify whether the 6.0 m Habitat tracks a specific clause in EN 12464-1

Source-document inconsistencies (open)

# Issue Action
1 Academic Small area: 105 m² (DTCG) vs 87.7 m² (subtypes DTCG / Samples V2) Operator decision needed
2 Medical Z1 token = 7.2 m, sketch = 286 5/8" = 7.28 m Token file pending update to 7.2819 m
3 Professional Office Z2/Z3 placeholders (V12: 3 m / 3 m TBD) Values to confirm from Key Plan
4 Floor-plate hard-coded 20,000 SF; Notes V3 directs ranges Convert to range token
5 21 m PDF total vs prior 21.6 m token arithmetic Reconciled 2026-05-17 by restoring V12 values

See also

Important Information

Important Information

Securities offering. Woodfine Capital Projects Inc. ("Woodfine") sponsors real-property direct-hold solutions. Interests in those solutions are offered only to investors who qualify under an applicable prospectus exemption — including the accredited-investor exemption under National Instrument 45-106 — Prospectus Exemptions, and equivalent exemptions in other applicable jurisdictions. Content on this wiki is provided for general informational purposes only and does not constitute an offer to sell, or a solicitation of an offer to buy, any security. Any offering is made exclusively by means of the applicable Private Placement Memorandum, which prospective investors should review, together with their own professional advisors, before investing.

Scope. This wiki describes Woodfine's research methodology, geographic data platform, and related activities at a high level and is qualified in its entirety by the applicable Private Placement Memorandum and the governing documents of the relevant issuer.

Risk. Investment in real-property direct-hold solutions involves significant risk, including possible loss of capital. Past performance is not indicative of future results. References to structural features such as advisory fees, transferability, and net asset value methodology describe the contractual terms of the direct-hold solutions and are not representations as to investment outcomes or returns.

Forward-looking statements. Statements that are not historical facts may constitute forward-looking information within the meaning of applicable Canadian securities laws. Such statements are subject to known and unknown risks, uncertainties and assumptions, and actual results may differ materially. Woodfine undertakes no obligation to update such statements except as required by law.

Registration. Registrable activities of Woodfine and its affiliates are conducted, where required, under the applicable registration categories prescribed by the British Columbia Securities Commission and other Canadian securities regulators. Specific registration details are available on request.

Jurisdiction. Woodfine Capital Projects Inc. is organized in British Columbia, Canada. References to the Sovereign Data Foundation on this wiki describe a planned or intended initiative only, not a current equity holder or active governance body.

Trademarks. See TRADEMARK.md in this repository for the full trademark notice.

Changes to this notice. Woodfine may update this notice from time to time; the version posted on this page governs.

Not a filing system. This wiki is not a securities filing system, an electronic disclosure repository, or a substitute for SEDAR+ or any other regulatory filing system. Formal securities filings are made through the applicable regulatory filing system, not through this wiki.

Full disclaimer. This notice supplements, and does not replace, the full Disclaimers article. In the event of any conflict, the full Disclaimers article governs.

Read the full disclaimer →