Site Selection
docs(site-selection): retitle 'Zoning acquisition rules' to 'Zoning acquisition standard' -- 'rules' implied mechanical certainty the corrected content no longer claims (judgment-based due diligence, disclosed entitlement risk); slug unchanged, 5 inbound link labels fixed (operator-caught)
@@ -12,7 +12,7 @@ index_scope: site-selection status: active bcsc_class: current-fact language_protocol: PROSE-TOPIC last_edited: 2026-08-26 last_edited: 2026-08-27 editor: pointsav-engineering paired_with: _index.es.md --- @@ -72,7 +72,7 @@ Site Selection covers the method behind "near Power Centres" — the discipline ## Before Land Is Bought [[zoning-acquisition-rules|Zoning Acquisition Rules]] requires a verified entitlement position on every parcel — either a permitted use or an evidenced, achievable rezoning path — before purchase. [[asset-evaluation-protocol|The Asset Evaluation Protocol]] sets tier score as the entry criterion and independent GIS analysis as the verification method a candidate site must clear. [[zoning-acquisition-rules|Zoning Acquisition Standard]] requires a verified entitlement position on every parcel — either a permitted use or an evidenced, achievable rezoning path — before purchase. [[asset-evaluation-protocol|The Asset Evaluation Protocol]] sets tier score as the entry criterion and independent GIS analysis as the verification method a candidate site must clear. <!-- AUTO-GENERATED MEMBERSHIP: DO NOT EDIT BELOW — regenerate from index_group: before-land-is-bought --> - [[zoning-acquisition-rules]] — Pre-purchase entitlement verification: every parcel is acquired against either a permitted use or an evidenced, achievable rezoning path, with an active development timeline and no speculative land banking.