Site Selection
fix(site-selection): correct zoning-acquisition-rules.md's false absolute (zoning must already permit use) to the real deal-by-deal entitlement standard, with BCSC no-assurance disclosure (Fable/Opus cross-model draft, operator-selected structure, sourced against real risk-factor and Development Approvals language)
@@ -72,10 +72,10 @@ Site Selection covers the method behind "near Power Centres" — the discipline ## Before Land Is Bought [[zoning-acquisition-rules|Zoning Acquisition Rules]] requires confirmed zoning on every parcel before purchase. [[asset-evaluation-protocol|The Asset Evaluation Protocol]] sets tier score as the entry criterion and independent GIS analysis as the verification method a candidate site must clear. [[zoning-acquisition-rules|Zoning Acquisition Rules]] requires a verified entitlement position on every parcel — either a permitted use or an evidenced, achievable rezoning path — before purchase. [[asset-evaluation-protocol|The Asset Evaluation Protocol]] sets tier score as the entry criterion and independent GIS analysis as the verification method a candidate site must clear. <!-- AUTO-GENERATED MEMBERSHIP: DO NOT EDIT BELOW — regenerate from index_group: before-land-is-bought --> - [[zoning-acquisition-rules]] — Pre-purchase verification requirements ensuring every parcel acquired has confirmed zoning for the intended development, eliminating speculative land banking. - [[zoning-acquisition-rules]] — Pre-purchase entitlement verification: every parcel is acquired against either a permitted use or an evidenced, achievable rezoning path, with an active development timeline and no speculative land banking. - [[asset-evaluation-protocol]] — How the co-location ranking matrix drives Woodfine's commercial asset acquisition targeting: tier score as the entry criterion, independent GIS analysis as the verification method. <!-- END AUTO-GENERATED -->