Geometry of sustainability
Maintained by Woodfine Capital Projects Inc.. Each revision is content-addressed by its commit hash.
- feat(building-design): reconcile Geometry of Sustainability with the BIM site's construction-volume pillar — add routing paragraph + See also, fix bare-code link
- fix(building-design): cite real regulatory instruments (EN 12464-1, SIA 382/1, ArbStättV §12) in geometry-of-sustainability, add real reference sources; correct German 'Law' to 'Ordinance' and narrow the circulation claim to what's verified
- docs(categories): rename 10 index_group labels + split markets Market Coverage group
- docs(projects): rewrite all 11 category Index Topics as thematic Index Topics — fix stale industry/ post-retraction, build out thin hub pages, add index_group frontmatter wiki-wide
- docs(building-design): propagate 9 EN Correction callouts to ES pairs, remove internal-process narration, and genericize leak-boundary references
- Urgent: archive 32 files (16 EN+ES pairs) live-exposing internal-only content on the public projects wiki -- 2 news/ articles carried a literal 'For internal use -- Woodfine client communications' banner; 14 building-design/ files were frontmatter-marked bcsc_class: vendor-internal but published anyway (exact measurements, TODO checklists, internal doc citations, operator workflow notes). Fable/Opus ingest-check findings, operator-approved immediate action given time constraint. Also fixed 2 dangling inbound links
- fix(privacy): sync pwoodfine fork with canonical — pulls in 2026-08-03 jmwoodfine@gmail.com redaction (NEXT.md item 20) + 60 other canonical commits since fork diverged
- fix(privacy): sync jwoodfine fork with canonical — pulls in 2026-08-03 jmwoodfine@gmail.com redaction (NEXT.md item 20) + 60 other canonical commits since fork diverged
- docs(projects wiki): fidelity sweep round 3 — building-design/ (31 articles), 17 defective; fabricated UI components as current (BIM engine is placeholder-only), real IFC/standards citation errors, cross-article dimension/arithmetic inconsistencies
- editorial(titles): sentence-case re-casing across markets/projects titles
- Phase C D1: receive 16 industry/methodology articles from media-knowledge-corporate (industry 8, buildings 2, site-selection 4, building-design 2); frontmatter aligned to projects convention (bcsc_class: current-fact, audience: customer-woodfine)