Professional centres development class
Maintained by Woodfine Capital Projects Inc.. Each revision is content-addressed by its commit hash.
- docs(entity-naming): Phase 3 batch 2 — fix MCorp direct-hold portfolio/development-model possessive misattribution in buildings/ (entity-naming-convention.md §§1,3,7.3,10)
- docs(projects): rewrite all 11 category Index Topics as thematic Index Topics — fix stale industry/ post-retraction, build out thin hub pages, add index_group frontmatter wiki-wide
- docs(building-design): add 6 new TOPICs from redaction-reviewed design-collaboration source (4:1 parking ratio, design sequence priority, Common Building Code, water management system, tile-level climate zoning, structural bay depth discipline), plus Sub-Prototype and Campus Design BIM-massing supplements
- style(projects-wiki): consequence-first lead rewrites per register-corporate.yaml — buildings class articles, mix-of-use, centralized-buying-program, optimum-mosaic, regional-market-demographic-threshold, development-regions (EN+ES pairs; no facts, numbers, or planned/intended language changed)
- style(projects-wiki): sentence-case headings across rollout/urban/buildings/reference/architecture (EN+ES pairs, terms of art preserved); move Data sources attribution before See also in commuter/urban-fringe to satisfy terminal-section order
- fix(privacy): sync pwoodfine fork with canonical — pulls in 2026-08-03 jmwoodfine@gmail.com redaction (NEXT.md item 20) + 60 other canonical commits since fork diverged
- fix(privacy): sync jwoodfine fork with canonical — pulls in 2026-08-03 jmwoodfine@gmail.com redaction (NEXT.md item 20) + 60 other canonical commits since fork diverged
- editorial: rename Woodfine Management Corp -> MCorp in casual body prose (trademark sweep)
- editorial(titles): sentence-case re-casing across markets/projects titles
- Follow-on 2/3: reconcile six-development-class taxonomy — narrowed class-professional-centres from a 4-type umbrella to a peer article; redistributed its detail to class-suburban-office (floor count, Offset Pulled Back Core), class-retail-select (tenant list, food-service exclusion + rationale), and class-tech-industrial (25/75 configuration, upgraded from planned to complete — the specs already existed in the corpus); fixed about-development-class-economics' four-class lede + food-service contradiction with Retail Select; added a note that Parking Structures/Vertical Warehouses economics are still pending
- Phase C D1: receive 16 industry/methodology articles from media-knowledge-corporate (industry 8, buildings 2, site-selection 4, building-design 2); frontmatter aligned to projects convention (bcsc_class: current-fact, audience: customer-woodfine)