BIM design philosophy
Maintained by Woodfine Capital Projects Inc.. Each revision is content-addressed by its commit hash.
- docs(building-design): archive 8 more PointSav platform-architecture articles (16 files EN+ES) -- continuation of the same operator-directed audit that migrated the first 5
- docs(building-design,gis,site-selection): archive 5 PointSav platform-architecture articles + retract redundant location-intelligence-strategy
- docs(projects): rewrite all 11 category Index Topics as thematic Index Topics — fix stale industry/ post-retraction, build out thin hub pages, add index_group frontmatter wiki-wide
- docs(building-design): trim the remaining 4 reframed BIM articles to high-level overview -- same operator-directed content-scope policy applied to bim-market-context.md: bim-design-philosophy.md, bim-objects-what-they-are.md, property-manager-bim-gap.md, and open-bim-regulatory-acceptance.md (heaviest remaining candidate, had its own country-by-country mandate table) all cut implementation-level specification (design-token internals, GuidSearch/AuditLog components, YAML sidecar mechanics, ITAR/GDPR/HIPAA compliance detail, ISO 19650 CDE mapping, licensing analysis) down to institutional-register overview, routing to bim.woodfinegroup.com for the specification itself (EN+ES)
- docs(building-design): propagate 9 EN Correction callouts to ES pairs, remove internal-process narration, and genericize leak-boundary references
- docs(building-design): reframe bim-market-context + 4 sibling articles from current-fact to intended/designed-to framing; genericize two unsourced stats; fix Italy BIM mandate date inconsistency
- Follow-on 3/3: consolidate bim-token-* into bim-objects-* — corpus-canonical term is 'BIM Object' (127 vs 33 mentions); fixed named-competitor violation (Solibri, Archistar, Revit Family) discovered on the surviving articles during consolidation; 3 duplicates retired as aliases + redirects
- Phase C D2: receive 11 articles from media-knowledge-documentation (site-selection 2, gis 1, rollout 1, building-design 7); frontmatter aligned to projects convention; internal Foundry vocabulary stripped. Track D (cross-repo receive) COMPLETE.