The buildings-and-places record for Woodfine Capital Projects Inc.: six development classes, the design system behind them, and the site-selection method built on established retail anchors. Articles span regional markets across North America and Europe, the planned development program, and the maps and data behind the analysis.

Development site monitoring register

← All revisions

aac82ae3 · Woodfine Capital Projects Inc. ·

style(projects-wiki): sentence-case headings across rollout/urban/buildings/reference/architecture (EN+ES pairs, terms of art preserved); move Data sources attribution before See also in commuter/urban-fringe to satisfy terminal-section order

View the full record as of this revision →

@@ -20,7 +20,7 @@ cites: []

The **Development Site Monitoring Register** holds Primary Target locations that achieve a qualified co-location cluster score but cannot enter the active Development Site pipeline because adjacent land is not currently available for acquisition. The register is a scored inventory — not an inactive or archived list — updated on the same annual or biennial cadence as Primary Target sales per square foot data. Sites in the register retain their cluster score and demographic profile. They re-enter the active pipeline when adjacent land availability is confirmed through the real estate professional assessment process.

## Why Land Availability is a Separate Gate
## Why land availability is a separate gate

A Primary Target that achieves a qualifying cluster score (T1 Valid ≥ 150 on the [[geographic-co-location-methodology|five-degree scoring system]]) has demonstrated the co-location conditions that Woodfine requires: Home Depot and Costco within the primary radius threshold, and qualifying Tertiary Target presence within the tertiary radius threshold. The cluster score verifies that the commercial environment is correct for a Woodfine Building.

@@ -41,13 +41,13 @@ Adjacent land availability is a separate condition. A site can have the correct 

The Monitoring Register preserves the investment made in scoring and profiling these sites rather than discarding them from the dataset. The site's qualifying cluster characteristics are not expected to change — the Primary Target is typically a large-format retailer with a long-term lease and substantial capital invested in the site — and the probability that adjacent land will eventually become available is a function of normal commercial real estate turnover in the surrounding area.

## Update Cadence and Scoring Maintenance
## Update cadence and scoring maintenance

Monitoring Register sites are reviewed on the same schedule as the active pipeline: annually or biennially when Primary Target sales per square foot data is refreshed. At each update cycle, the real estate professionals engaged by Woodfine in the relevant market assess land availability for each Monitoring Register site in their area. A site where adjacent land has become available is escalated from the Monitoring Register to the active pipeline and advances to the [[transaction-summary-report-protocol|Transaction Summary Report]] stage.

The cluster score for each Monitoring Register site is also recalculated at each update cycle, using the same methodology applied to the full Primary Target population. A site that was [[gis-cluster-scoring-glossary|T2 Hub]] at initial assessment may be upgraded to T3 Apex if the Primary Target's sales per square foot have improved relative to the chain average, or if a Tertiary Target has opened within the relevant radius threshold since the initial scoring date.

## Re-Entry Criteria
## Re-entry criteria

A Monitoring Register site re-enters the active Development Site pipeline when two conditions are satisfied:

@@ -57,6 +57,6 @@ A Monitoring Register site re-enters the active Development Site pipeline when t

Sites that satisfy both conditions proceed to the Transaction Summary Report preparation and Independent Directors review process. The monitoring period has no defined maximum length: a site remains in the register until it meets both conditions, or until the co-location conditions deteriorate permanently (for example, permanent closure of the Primary Target), at which point the site is removed from the dataset entirely.

## Relationship to Pipeline Counts
## Relationship to pipeline counts

Required development counts for each Direct-Hold Solution — 26 sites for Canada, 52 for the United States, 26 for Mexico — are based on active pipeline sites only. Monitoring Register sites are not counted toward the required development total. The 2:1 minimum shortlist ratio applies to active pipeline sites; the Monitoring Register is a reserve of future pipeline candidates, not a component of the current shortlist calculation.
Important Information

Important Information

Securities offering. Woodfine Capital Projects Inc. ("Woodfine") sponsors real-property direct-hold solutions. Interests in those solutions are offered only to investors who qualify under an applicable prospectus exemption — including the accredited-investor exemption under National Instrument 45-106 — Prospectus Exemptions, and equivalent exemptions in other applicable jurisdictions. Content on this wiki is provided for general informational purposes only and does not constitute an offer to sell, or a solicitation of an offer to buy, any security. Any offering is made exclusively by means of the applicable Private Placement Memorandum, which prospective investors should review, together with their own professional advisors, before investing.

Scope. This wiki describes Woodfine's research methodology, geographic data platform, and related activities at a high level and is qualified in its entirety by the applicable Private Placement Memorandum and the governing documents of the relevant issuer.

Risk. Investment in real-property direct-hold solutions involves significant risk, including possible loss of capital. Past performance is not indicative of future results. References to structural features such as advisory fees, transferability, and net asset value methodology describe the contractual terms of the direct-hold solutions and are not representations as to investment outcomes or returns.

Forward-looking statements. Statements that are not historical facts may constitute forward-looking information within the meaning of applicable Canadian securities laws. Such statements are subject to known and unknown risks, uncertainties and assumptions, and actual results may differ materially. Woodfine undertakes no obligation to update such statements except as required by law.

Registration. Registrable activities of Woodfine and its affiliates are conducted, where required, under the applicable registration categories prescribed by the British Columbia Securities Commission and other Canadian securities regulators. Specific registration details are available on request.

Jurisdiction. Woodfine Capital Projects Inc. is organized in British Columbia, Canada. References to the Sovereign Data Foundation on this wiki describe a planned or intended initiative only, not a current equity holder or active governance body.

Trademarks. The full trademark notice appears in the footer of every page on this site.

Content licence. The text of this wiki is licensed under Creative Commons Attribution-NoDerivatives 4.0 International (CC BY-ND 4.0). Readers may quote this content verbatim, with attribution to Woodfine Capital Projects Inc. Readers may not alter, transform, or redistribute a modified version of this content.

Changes to this notice. Woodfine may update this notice from time to time; the version posted on this page governs.

Not a filing system. This wiki is not a securities filing system, an electronic disclosure repository, or a substitute for SEDAR+ or any other regulatory filing system. Formal securities filings are made through the applicable regulatory filing system, not through this wiki.

Full disclaimer. This notice supplements, and does not replace, the full Disclaimers article. In the event of any conflict, the full Disclaimers article governs.

Read the full disclaimer →