Development site monitoring register
docs(projects): replace fabricated V2/'Nth-Degree Cluster' co-location scoring vocabulary with the real, current V3 tier system (Regional/District/Local/Fringe, predicate-gate logic) sourced directly from project-gis's SCORING-METHODOLOGY.md -- V2 was deprecated 2026-05-16, the Degree-Cluster nomenclature never existed in any real methodology doc; resolves two long-standing unresolved 'Correction' flags (2026-08-02) that had identified symptoms of this but never traced it to source (EN+ES)
@@ -10,7 +10,7 @@ quality: complete short_description: "Passive tracking register holding qualified co-location sites removed from the active pipeline for adjacent land unavailability, kept scored with documented re-entry criteria." status: stable bcsc_class: current-fact last_edited: 2026-07-11 last_edited: 2026-08-24 editor: pointsav-engineering language_protocol: PROSE-TOPIC source_refs: @@ -23,20 +23,17 @@ The **Development Site Monitoring Register** holds Primary Target locations that ## Why land availability is a separate gate A Primary Target that achieves a qualifying cluster score (T1 Valid ≥ 150 on the [[geographic-co-location-methodology|five-degree scoring system]]) has demonstrated the co-location conditions that Woodfine requires: Home Depot and Costco within the primary radius threshold, and qualifying Tertiary Target presence within the tertiary radius threshold. The cluster score verifies that the commercial environment is correct for a Woodfine Building. **Correction (2026-08-02, verified against this article's own cited sibling docs, [[geographic-co-location-methodology]] and [[gis-cluster-scoring-glossary]]):** the conditions just described — both Home Depot and Costco present, plus a qualifying Tertiary Target — define a **Fourth-Degree Cluster**, not "T1 Valid." Per the glossary, T1 Valid (score ≥ 150) is explicitly the entry-level tier with "Primary Target presence with partial co-location confirmation" — the qualifying bar is materially lower than what's described here. A cluster meeting the description actually given would score well above the T2 Hub (≥450) or T3 Apex (≥700) thresholds. Same mismatch recurs below in the re-entry criteria ("maintained or improved... at or above the T1 Valid threshold"). **Flagged, not resolved** — needs a decision on which tier threshold this register is actually meant to gate re-entry at, not a mechanical label swap. A Primary Target that clears a qualifying tier — Local, District, or Regional, per the [[geographic-co-location-methodology|current tier system]] — has demonstrated the co-location and catchment conditions that Woodfine requires. A Fringe cluster does not qualify. The tier verifies that the commercial environment is correct for a Woodfine Building. **Correction (2026-08-02), resolved (2026-08-24):** this section previously cited a fabricated "T1 Valid ≥ 150" scoring threshold from a deprecated points-based system (retired platform-wide 2026-05-16; see [[gis-cluster-scoring-glossary]]). The register's actual re-entry test — a site must remain above the disqualifying floor — is now stated directly against the current tier system: any tier other than Fringe qualifies. This restates the register's original intent (a site qualifies once it clears the lowest bar the tier system sets, not a specific score) without asserting a score-to-tier mapping that does not exist in the current pipeline. Adjacent land availability is a separate condition. A site can have the correct co-location configuration and the correct demographic profile, but lack a parcel adjacent to the Primary Target that is available for acquisition at the time of assessment. This is particularly common in [[about-regional-markets-system|Regional Markets]] where the [[power-centres|Power Centre]] footprint has been fully developed and surrounding parcels are occupied by existing buildings whose owners are not current sellers. @@ -46,7 +43,7 @@ The Monitoring Register preserves the investment made in scoring and profiling t Monitoring Register sites are reviewed on the same schedule as the active pipeline: annually or biennially when Primary Target sales per square foot data is refreshed. At each update cycle, the real estate professionals engaged by Woodfine in the relevant market assess land availability for each Monitoring Register site in their area. A site where adjacent land has become available is escalated from the Monitoring Register to the active pipeline and advances to the [[transaction-summary-report-protocol|Transaction Summary Report]] stage. The cluster score for each Monitoring Register site is also recalculated at each update cycle, using the same methodology applied to the full Primary Target population. A site that was [[gis-cluster-scoring-glossary|T2 Hub]] at initial assessment may be upgraded to T3 Apex if the Primary Target's sales per square foot have improved relative to the chain average, or if a Tertiary Target has opened within the relevant radius threshold since the initial scoring date. The cluster tier for each Monitoring Register site is also reassessed at each update cycle, using the same methodology applied to the full Primary Target population. A site that was [[gis-cluster-scoring-glossary|District]] at initial assessment may be upgraded to Regional if a new anchor opens nearby and changes the cluster's composition, if updated catchment population data shifts its national percentile rank, or if a hospital within its civic ring is reclassified. ## Re-entry criteria @@ -54,7 +51,7 @@ A Monitoring Register site re-enters the active Development Site pipeline when t 1. **Land availability confirmed.** The real estate professional engaged in the market identifies a parcel adjacent to the Primary Target — defined as contiguous or immediately accessible to the Power Centre site — that is available for acquisition or ground lease at terms consistent with the applicable Direct-Hold Solution's underwriting parameters. 2. **Cluster score maintained or improved.** The site's cluster score at the time of the re-entry assessment must be at or above the T1 Valid threshold (≥ 150). A site that has fallen below the qualifying threshold — for example, because a Secondary Target has closed — does not re-enter the active pipeline until the qualifying co-location conditions are restored. 2. **Cluster tier maintained or improved.** The site's cluster tier at the time of the re-entry assessment must be Local, District, or Regional — not Fringe. A site that has fallen to Fringe — for example, because an anchor has closed and the cluster's composition no longer clears any tier's gates — does not re-enter the active pipeline until the qualifying co-location conditions are restored. Sites that satisfy both conditions proceed to the Transaction Summary Report preparation and Independent Directors review process. The monitoring period has no defined maximum length: a site remains in the register until it meets both conditions, or until the co-location conditions deteriorate permanently (for example, permanent closure of the Primary Target), at which point the site is removed from the dataset entirely.