City code as composable geometry

Every building code compliance tool in production follows the same architecture: a completed design model is submitted to a rules engine, which generates a violation report, which a human must review and remediate before resubmission. This post-design validation model has been the industry standard for twenty years. It produces a structural tension between design iteration speed and compliance verification. The more thorough the rules engine, the longer each review cycle. A different architecture is possible: if regulatory requirements are encoded directly into the elements available to a designer — not as rules applied to a finished model but as geometric and numeric constraints embedded in the element specification — then non-compliant configurations cannot be placed. This is the City Code as Composable Geometry model, and it is the architectural claim underlying the BIM Object platform.

The Validation-First Paradigm

Post-design validation tools operate on a common pattern:

  1. A designer authors a model in an IFC-capable authoring tool.
  2. The model is exported to IFC format and submitted to a validation service.
  3. The validation service applies a ruleset — encoded in proprietary rule languages, IDS 1.0 constraint files, or platform-specific scripting — and produces a report listing violations.
  4. A human reviews the report, returns to the authoring tool, makes corrections, and resubmits.

This cycle repeats until the model passes. Most authoring tools enforce nothing at placement time: any element may be placed anywhere until the external validator objects.

The consequences are operational. Design teams budget iteration time for compliance review. On complex projects, regulatory review cycles add weeks to design phases. The validator is a gating function that sits outside the design environment and communicates asynchronously with it.

Prior Art Survey

Research conducted in April 2026 identified four categories of prior art, all in the validation-first quadrant.

IDS 1.0 (Information Delivery Specification). buildingSMART's IDS standard encodes property constraints in XML. An IDS file declares what a valid model contains — it is a validation language, not a constraint on element palettes. IDS files are inputs to validators, not constraints applied during design.

bSDD (buildingSMART Data Dictionary). The bSDD provides semantic identity for element types across jurisdictions and tools. It does not encode regulatory constraints or climate zone performance requirements. A bSDD URI is an identity anchor, not a constraint specification.

Post-design validation platforms. Commercial BIM validation platforms operate post-design. Their rules engines can check geometry, topology, property values, and spatial relationships — but they operate as audit tools on submitted models. Non-compliant models pass through authoring environments without objection until submission.

Singapore CORENET X. The most advanced government BIM submission system in public production. CORENET X accepts IFC models submitted for building permit applications and runs automated code compliance checks against Singapore's regulatory requirements. It remains a validator: models are authored freely, submitted to CORENET X, and returned with violation reports. The 2024 implementation adds real-time guidance in some authoring tool plugins, narrowing but not closing the gap between validation-first and composition-first. It is jurisdiction-specific and not available as a neutral platform for other jurisdictions.

Assessment. All identified prior art occupies the validation-first quadrant. The compositional-first quadrant — encoding constraints into element specifications before authoring — has no established prior art in public production as of 2026.

The Compositional Mechanism

City Code as Composable Geometry operates through a three-layer technical mechanism.

Layer 1: Semantic identity via bSDD. Every BIM Object carries a bSDD concept URI identifying its element type in a jurisdiction-neutral, tool-neutral reference. This URI is the stable identity that allows Regulation and Climate Zone overlays to reference the same element type regardless of IFC version drift.

Layer 2: Regulatory constraint via IDS 1.0. Each registered jurisdictional overlay for a BIM Object includes an IDS 1.0 constraint file. The IDS file encodes numeric and property constraints: maximum U-values, minimum structural ratings, fire resistance class requirements, accessibility clearances. When a BIM Object is placed in a model, its registered IDS constraints are part of its specification — the authoring environment receives these as element requirements at placement time, not as post-placement rules.

Layer 3: Exclusion geometry via IFC fragment. Where a regulatory requirement has geometric expression — a fire compartment boundary that an element must not cross, a setback from a property line, an accessibility envelope that must remain clear — the jurisdictional overlay includes an IFC fragment: a solid geometry encoded in IFC format that defines the excluded or required space. This fragment is associated with the BIM Object and resolves at placement time. It cannot be overridden by numeric constraints.

The composition of these three layers is what makes the geometry "encode" the code. The regulatory constraint is not stored in a separate validation database checked after authoring. It is stored in the BIM Object specification and instantiated with the element.

Geometric Exclusion in Detail

The IFC fragment mechanism addresses the class of regulatory requirements that numeric constraints cannot express.

Consider a fire compartment wall in a multi-storey building. The requirement is not simply "this wall must have fire resistance class REI 90." It is also "this wall must form a continuous plane from floor slab to ceiling slab with no penetrations except those covered by appropriately rated closure devices." The second requirement is topological and geometric: the wall must occupy a specific spatial relationship to surrounding elements.

An IDS numeric constraint can express REI 90. It cannot express the topological continuity requirement. An IFC geometric exclusion fragment can: it encodes the spatial volume that the fire compartment boundary must occupy and the adjacent spatial volumes that must be filled by conforming construction. Authoring tools that consume the fragment can display the required geometry as a design guide and flag deviations in real time.

This is qualitatively different from post-design validation. The designer sees the required spatial configuration during authoring, not after submission.

Structural Constraints on Centralised Approaches

Research identified three structural reasons why centralised cloud approaches cannot replicate the City Code as Composable Geometry model for all deployment contexts.

Regulatory data sovereignty. Jurisdictional regulatory data is public law. Encoding it as a service hosted on a commercial cloud platform creates procurement and sovereignty concerns for non-US jurisdictions under EU data residency requirements, GDPR restrictions, and equivalent national frameworks. A neutral platform that cities and national governments can self-host or have hosted under national cloud frameworks is structurally required for broad adoption.

Offline-first requirement. Construction sites frequently operate without reliable network connectivity. ITAR-restricted projects, remote sites, and many public infrastructure projects require the constraint data to be available offline. A cloud-dependent validation service cannot serve these use cases. A BIM Object vault cloned via git and stored locally is available offline unconditionally.

Commercial platform neutrality. Cities and national governments issuing regulatory requirements need to publish them to all conformant BIM platforms, not to specific commercial vendors. Publishing code requirements to a neutral, open-format JSON standard (W3C DTCG with BIM extensions) and distributing them via public git repositories is analogous to publishing building codes as PDF — neutral, reproducible, and vendor-independent.

Implementation Stages

The City Code as Composable Geometry model is implemented progressively.

Stage 1 (current, planned for v0.0.3): BIM Object vault with Specification layer complete. Regulation layer skeleton present with first overlay set: British Columbia residential (RS-1 zoning) — selected because MCorp operates in BC and is the reference customer. Climate Zone layer populated with BC temperate-coastal zone (ASHRAE 5C equivalent) performance parameters.

Stage 2 (intended, v0.1.x): IDS 1.0 constraint file generation. For each registered Regulation overlay, a conformant IDS 1.0 file is generated from the BIM Object data and published alongside the DTCG JSON. This enables existing IDS-aware validators to consume PointSav-authored constraint specifications.

Stage 3 (intended, future): Authoring tool integration. A plugin or API surface that delivers BIM Object constraints to IFC-capable authoring tools at placement time, not at submission time. The authoring tool receives the element palette constrained to conformant BIM Objects for the project's jurisdiction and climate zone.

See also

Important Information

Important Information

Securities offering. Woodfine Capital Projects Inc. ("Woodfine") sponsors real-property direct-hold solutions. Interests in those solutions are offered only to investors who qualify under an applicable prospectus exemption — including the accredited-investor exemption under National Instrument 45-106 — Prospectus Exemptions, and equivalent exemptions in other applicable jurisdictions. Content on this wiki is provided for general informational purposes only and does not constitute an offer to sell, or a solicitation of an offer to buy, any security. Any offering is made exclusively by means of the applicable Private Placement Memorandum, which prospective investors should review, together with their own professional advisors, before investing.

Scope. This wiki describes Woodfine's research methodology, geographic data platform, and related activities at a high level and is qualified in its entirety by the applicable Private Placement Memorandum and the governing documents of the relevant issuer.

Risk. Investment in real-property direct-hold solutions involves significant risk, including possible loss of capital. Past performance is not indicative of future results. References to structural features such as advisory fees, transferability, and net asset value methodology describe the contractual terms of the direct-hold solutions and are not representations as to investment outcomes or returns.

Forward-looking statements. Statements that are not historical facts may constitute forward-looking information within the meaning of applicable Canadian securities laws. Such statements are subject to known and unknown risks, uncertainties and assumptions, and actual results may differ materially. Woodfine undertakes no obligation to update such statements except as required by law.

Registration. Registrable activities of Woodfine and its affiliates are conducted, where required, under the applicable registration categories prescribed by the British Columbia Securities Commission and other Canadian securities regulators. Specific registration details are available on request.

Jurisdiction. Woodfine Capital Projects Inc. is organized in British Columbia, Canada. References to the Sovereign Data Foundation on this wiki describe a planned or intended initiative only, not a current equity holder or active governance body.

Trademarks. See TRADEMARK.md in this repository for the full trademark notice.

Changes to this notice. Woodfine may update this notice from time to time; the version posted on this page governs.

Not a filing system. This wiki is not a securities filing system, an electronic disclosure repository, or a substitute for SEDAR+ or any other regulatory filing system. Formal securities filings are made through the applicable regulatory filing system, not through this wiki.

Full disclaimer. This notice supplements, and does not replace, the full Disclaimers article. In the event of any conflict, the full Disclaimers article governs.

Read the full disclaimer →