Skip to content

BIM objects — what they are

← All revisions

c3e5d241 · Woodfine Capital Projects Inc. ·

Follow-on 3/3: consolidate bim-token-* into bim-objects-* — corpus-canonical term is 'BIM Object' (127 vs 33 mentions); fixed named-competitor violation (Solibri, Archistar, Revit Family) discovered on the surviving articles during consolidation; 3 duplicates retired as aliases + redirects

View the full record as of this revision →

@@ -12,6 +12,8 @@ editor: pointsav-engineering
short_description: "BIM Objects are composable built-environment specification units that encode element type, regulatory requirements by jurisdiction, and climate zone performance requirements, pre-constraining the design space so non-compliant configurations cannot be placed."
cites: [ifc-4-3, uniclass-2015, bsdd-v1, ids-1-0, dtcg-w3c]
paired_with: building-design/bim-objects-what-they-are.es.md
aliases:
  - bim-token-what-it-is
---

Building Information Modelling produces detailed digital representations of structures. It does not, in its standard form, prevent violations. A model can be geometrically complete, materially specified, and classified by IFC entity type while still containing elements that fail code compliance, violate climate performance floors, or conflict with jurisdictional regulation — discoveries made only when a post-design checker runs. A BIM Object addresses this upstream. It encodes a built-environment element decision as a composable, aliasable specification unit that pre-constrains the design space rather than auditing a completed model. See also [[bim-objects-substrate|BIM object categories]] and [[design-system-bim|the Building Design System]].
@@ -32,7 +34,7 @@ Precision requires distinguishing the BIM Object from four structures it superfi

**Not an IFC entity type.** IFC 4.3 (ISO 16739-1:2024) defines `IfcWall`, `IfcSlab`, `IfcBeam`, and approximately 900 other schema classes. An IFC entity type is a schema class — it defines what data shape a wall record must conform to. It carries no constraint values, no jurisdiction-specific requirements, and no performance parameters. A BIM Object uses the IFC entity class as its identity anchor but adds the three constraint layers the schema class cannot hold.

**Not a Revit Family.** A Revit Family is geometry parameterised for one authoring tool, stored in a proprietary binary format, and vendor-locked. It carries no normative regulatory data, no jurisdiction mapping, and no climate zone performance specification. It cannot be read by non-Revit tooling without export. A BIM Object is plain JSON (W3C DTCG format), tool-neutral, and machine-readable by any conformant consumer.
**Not a proprietary BIM Family format.** A proprietary BIM Family format is geometry parameterised for one authoring tool, stored in a vendor-specific binary format, and tool-locked. It carries no normative regulatory data, no jurisdiction mapping, and no climate zone performance specification. It cannot be read by other tooling without export. A BIM Object is plain JSON (W3C DTCG format), tool-neutral, and machine-readable by any conformant consumer.

**Not a COBie spreadsheet.** COBie (Construction Operations Building Information Exchange) is after-the-fact data capture — facility management data extracted from a model after design is complete. It documents what was built. A BIM Object constrains what may be placed.

@@ -42,7 +44,7 @@ Precision requires distinguishing the BIM Object from four structures it superfi

## The Pre-Constraining Thesis

Two decades of BIM tooling have been built on a validation-first assumption: design freely, then check. Solibri, Archistar, and similar platforms run rules against completed models and report violations. Singapore's CORENET X — the most advanced government BIM submission system in production — operates on the same principle. Submit a model; receive a compliance report.
Two decades of BIM tooling have been built on a validation-first assumption: design freely, then check. Commercial validation platforms run rules against completed models and report violations. Singapore's CORENET X — the most advanced government BIM submission system in production — operates on the same principle. Submit a model; receive a compliance report.

The pre-constraining approach inverts this. If the only elements available to a designer are BIM Objects, and each BIM Object already encodes the regulatory and performance constraints applicable to its type in a given jurisdiction and climate zone, then the compliance report is structurally unnecessary. The model cannot be non-compliant because non-compliant configurations cannot be placed.

Important Information

Important Information

Securities offering. Woodfine Capital Projects Inc. ("Woodfine") sponsors real-property direct-hold solutions. Interests in those solutions are offered only to investors who qualify under an applicable prospectus exemption — including the accredited-investor exemption under National Instrument 45-106 — Prospectus Exemptions, and equivalent exemptions in other applicable jurisdictions. Content on this wiki is provided for general informational purposes only and does not constitute an offer to sell, or a solicitation of an offer to buy, any security. Any offering is made exclusively by means of the applicable Private Placement Memorandum, which prospective investors should review, together with their own professional advisors, before investing.

Scope. This wiki describes Woodfine's research methodology, geographic data platform, and related activities at a high level and is qualified in its entirety by the applicable Private Placement Memorandum and the governing documents of the relevant issuer.

Risk. Investment in real-property direct-hold solutions involves significant risk, including possible loss of capital. Past performance is not indicative of future results. References to structural features such as advisory fees, transferability, and net asset value methodology describe the contractual terms of the direct-hold solutions and are not representations as to investment outcomes or returns.

Forward-looking statements. Statements that are not historical facts may constitute forward-looking information within the meaning of applicable Canadian securities laws. Such statements are subject to known and unknown risks, uncertainties and assumptions, and actual results may differ materially. Woodfine undertakes no obligation to update such statements except as required by law.

Registration. Registrable activities of Woodfine and its affiliates are conducted, where required, under the applicable registration categories prescribed by the British Columbia Securities Commission and other Canadian securities regulators. Specific registration details are available on request.

Jurisdiction. Woodfine Capital Projects Inc. is organized in British Columbia, Canada. References to the Sovereign Data Foundation on this wiki describe a planned or intended initiative only, not a current equity holder or active governance body.

Trademarks. See TRADEMARK.md in this repository for the full trademark notice.

Changes to this notice. Woodfine may update this notice from time to time; the version posted on this page governs.

Not a filing system. This wiki is not a securities filing system, an electronic disclosure repository, or a substitute for SEDAR+ or any other regulatory filing system. Formal securities filings are made through the applicable regulatory filing system, not through this wiki.

Full disclaimer. This notice supplements, and does not replace, the full Disclaimers article. In the event of any conflict, the full Disclaimers article governs.

Read the full disclaimer →